Warehouse Clearance Sale! 35% Off All Items & Free Shipping! Hurry, Offer Ends:

00 HOURS
:
00 MINUTES
:
00 SECONDS
8.5ft H (1 Post w/Planter Box) Freestanding Zippity Concord String Light Post for Outdoor Hanging Lights, Outdoor
8.5ft H (1 Post w/Planter Box) Freestanding Zippity Concord String Light Post for Outdoor Hanging Lights, Outdoor
8.5ft H (1 Post w/Planter Box) Freestanding Zippity Concord String Light Post for Outdoor Hanging Lights, Outdoor
8.5ft H (1 Post w/Planter Box) Freestanding Zippity Concord String Light Post for Outdoor Hanging Lights, Outdoor
8.5ft H (1 Post w/Planter Box) Freestanding Zippity Concord String Light Post for Outdoor Hanging Lights, Outdoor
8.5ft H (1 Post w/Planter Box) Freestanding Zippity Concord String Light Post for Outdoor Hanging Lights, Outdoor
8.5ft H (1 Post w/Planter Box) Freestanding Zippity Concord String Light Post for Outdoor Hanging Lights, Outdoor
8.5ft H (1 Post w/Planter Box) Freestanding Zippity Concord String Light Post for Outdoor Hanging Lights, Outdoor

Click, double-click, or pinch to zoom

Casa Home Living

8.5ft H (1 Post w/Planter Box) Freestanding Zippity Concord String Light Post for Outdoor Hanging Lights, Outdoor

This 35% Sale ends today!

$398.99 $613.99

Free ShippingOn every order
30-Day ReturnsEasy & hassle-free
Entirely USA-BasedUS team, offices & warehouses
Call 888-298-2420Mon–Fri product support
Secure checkout — Visa · Mastercard · Amex · Discover · Apple Pay · Google Pay · PayPal
Know someone who'd love this?

8.5ft H (1 Post w/Planter Box) Freestanding Zippity Concord String Light Post for Outdoor Hanging Lights, Outdoor — urns and pedestal planters with real presence at a doorway or garden path.

Key Features

  • ONE LIGHT POST PER PURCHASE: You will receive one unassembled wood string light post with planter box per purchase
  • EASY TO ASSEMBLE: This wood string light pole assembles in approximately 60 minutes with only a power drill. You will receive materials for 1 pole for outdoor string lights. String lights are not included
  • FREESTANDING: No need to worry about messing with concrete or digging holes. This light post sits firmly in an aluminum reinforced FSC certified wood planter box
  • PLANTER BOX BASE: The planter box measures 22.5in H x 20in W x 20in L and the floorboard can be assembled at depths of 5" or 9.5". Before adding soil, we recommend filling the bottom chamber with at least 50lbs of small rocks or sandbags
  • DURABLE AND STURDY: Unlike flimsy aluminum light poles that bend and rust over time, our strong, FSC certified wood light post is reinforced by anodized posts around the planter box which provide additional stability. We recommend a distance of 144" (12ft) between light poles
  • BEAUTIFUL LIGHTING SOLUTION: Standing at over 8.5 ft tall, our string light pole with planter box for outside transforms any space into an oasis. Backyards, decks, patios, and gardens become the perfect setting for outdoor hanging lights

Specifications

Color Cedar
Item Dimensions 20 x 20 x 103.5 inches

Free shipping included. 30-day hassle-free returns.


Share this Product

Recently Viewed Products

Price Protection
Free Shipping
SSL Secure
Money Back Guarantee